Not sure if this is an issue with version 1.66 or in general:

When I test a strategy that loads the AssetsZ9.csv, setting e.g. EndDate=2015; does not stop the simulation. The simulation always goes up to the very last available date, regardless of which year I select. Is this a bug? Or maybe I am doing something wrong?