Gamestudio Links
Zorro Links
Newest Posts
Blobsculptor tools and objects download here
by NeoDumont. 03/28/24 03:01
Issue with Multi-Core WFO Training
by aliswee. 03/24/24 20:20
Why Zorro supports up to 72 cores?
by Edgar_Herrera. 03/23/24 21:41
Zorro Trader GPT
by TipmyPip. 03/06/24 09:27
VSCode instead of SED
by 3run. 03/01/24 19:06
AUM Magazine
Latest Screens
The Bible Game
A psychological thriller game
SHADOW (2014)
DEAD TASTE
Who's Online Now
3 registered members (VoroneTZ, monk12, Quad), 829 guests, and 4 spiders.
Key: Admin, Global Mod, Mod
Newest Members
sakolin, rajesh7827, juergen_wue, NITRO_FOREVER, jack0roses
19043 Registered Users
Previous Thread
Next Thread
Print Thread
Rate Thread
Page 1 of 2 1 2
WFO #475006
11/17/18 16:38
11/17/18 16:38
Joined: Feb 2015
Posts: 652
Milano, Italy
M
MatPed Offline OP
User
MatPed  Offline OP
User
M

Joined: Feb 2015
Posts: 652
Milano, Italy
Hi all.
I'd like to train my H4 strategy fixing the following parameters.

1) length of test period in bars: 6*22*4 (4 months)
2) EndDate = 20181031
3) DataSplit = 90
4) LoockBack = 200

I've tried to play around with some parameters using the setWFO2 recomended function too. But I have found erratic results.
The impression was that Zorro did not calculated correctly the StartDate of the simulation.

Any hint? Thank you

Re: WFO [Re: MatPed] #475007
11/17/18 16:49
11/17/18 16:49
Joined: Sep 2003
Posts: 929
Spirit Offline

Moderator
Spirit  Offline

Moderator

Joined: Sep 2003
Posts: 929
How have you set StartDate?

Re: WFO [Re: Spirit] #475009
11/17/18 17:06
11/17/18 17:06
Joined: Feb 2015
Posts: 652
Milano, Italy
M
MatPed Offline OP
User
MatPed  Offline OP
User
M

Joined: Feb 2015
Posts: 652
Milano, Italy
No fixed StartDate leaved as default. The idea will be to vary the datasplit and the test period in order to check strategy robustness. I can set a start date way in the past like 20090101 if needed... on the contrary it shoud be calculated I guess....but why?

Last edited by MatPed; 11/17/18 17:08.
Re: WFO [Re: MatPed] #475010
11/17/18 18:09
11/17/18 18:09
Joined: Sep 2003
Posts: 929
Spirit Offline

Moderator
Spirit  Offline

Moderator

Joined: Sep 2003
Posts: 929
by default, startdate is current year minus numyears i think. If you need a certain date then you must set it.

Re: WFO [Re: Spirit] #475011
11/17/18 22:57
11/17/18 22:57
Joined: Feb 2015
Posts: 652
Milano, Italy
M
MatPed Offline OP
User
MatPed  Offline OP
User
M

Joined: Feb 2015
Posts: 652
Milano, Italy
yes, I guess so. The question is how to calculate it from the EndDate...

Re: WFO [Re: MatPed] #475025
11/19/18 09:27
11/19/18 09:27
Joined: Jul 2000
Posts: 27,977
Frankfurt
jcl Offline

Chief Engineer
jcl  Offline

Chief Engineer

Joined: Jul 2000
Posts: 27,977
Frankfurt
For calculating it from EndDate, you need to set NumYears. If nothing is set, a 6 years backtest is assumed.

Re: WFO [Re: jcl] #475041
11/19/18 22:14
11/19/18 22:14
Joined: Feb 2015
Posts: 652
Milano, Italy
M
MatPed Offline OP
User
MatPed  Offline OP
User
M

Joined: Feb 2015
Posts: 652
Milano, Italy
Thank you JCL, can you articulate a little more?
How to keep the same EndDate, NumWFOCycles and the Length of Test period, while changing the dataSplit parameter (not in the same trainig, obviously)?

thank you

Re: WFO [Re: MatPed] #475044
11/20/18 11:31
11/20/18 11:31
Joined: Jul 2000
Posts: 27,977
Frankfurt
jcl Offline

Chief Engineer
jcl  Offline

Chief Engineer

Joined: Jul 2000
Posts: 27,977
Frankfurt
You can either set the length or the number of cycles, but obviously not both at the same time.

http://manual.zorro-project.com/numwfocycles.htm

Re: WFO [Re: jcl] #475053
11/20/18 15:47
11/20/18 15:47
Joined: Feb 2015
Posts: 652
Milano, Italy
M
MatPed Offline OP
User
MatPed  Offline OP
User
M

Joined: Feb 2015
Posts: 652
Milano, Italy
Thank you I am spending some time on that manual page...
why not at the same time?
There is not the way to configure Zorro in order ti train 12 cycles of 16 weeks each with an assigned DataSplit percentage?

Last edited by MatPed; 11/20/18 15:47.
Re: WFO [Re: MatPed] #475055
11/20/18 17:17
11/20/18 17:17
Joined: Jul 2000
Posts: 27,977
Frankfurt
jcl Offline

Chief Engineer
jcl  Offline

Chief Engineer

Joined: Jul 2000
Posts: 27,977
Frankfurt
You can configure anything you want, as long as you know what you want. In your example, the simulation period is 12x training time plus 11x test time plus lookback.